• Increase distance between lines.
  • Increase writing
  • Decrease writing
  • Print
  • Send to a friend

Metal coatings

Helios > Sales programmes > Metal reservoirs > Metal reservoirs

Three coat system: EP - EP - PUR

Surface preparation: sand blasting of a surface up to Sa 2.5 according to SIS 05 59 00
     
Coating name Product description *Minimal dry film thickness
REZISTOL primer
E - ZP MIOX
Two component epoxy primer 40 - 60 μm
REZISTOL enamel E-dbs MIOX Two component intermediate, high build epoxy coating 90 - 110 μm
REZISTOL enamel 2K PUR Two component polyurethane top coating 60 - 70 μm
Total dry film thickness 190 - 240μm

Three coat system with REZISTOL primer E-ZP MIOX as the quality primer, REZISTOL enamel E-dbs MIOX as the intermediate coating with micaceous iron oxide content, by which we improve the barrier protection of a coating system, and with REZISTOL enamel 2K PUR, offers high mechanical, chemical and weather resistance and assurs the outstanding corrosion protection in the most severe exposure conditions.

The stated HELIOS's system for the exterior protection of the above ground reservoirs assures an outstanding corrosion protection, suitable also for the most severe exposure conditions (corrosivity category up to C5-I and C5-M according to ISO 12944-2). In case of high temperatures, the reservoirs, which are protected with the mentioned corrosion protection system may be cooled with water.

* Recommended minimal dry film thicknesses